Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Overview

The Tests List Report shows a list of Test issues and their corresponding execution status. The execution status will depend on the Test Coverage Scope (i.e., on how you want to analyze the Tests). This allows a transversal analysis of the Tests for a project in a particular version and environment. More information about this report here.

Screenshot 2024-07-04 at 13.41.58.png

Configuration

Project

Select the project to analyze.

Saved Filter

You can further reduce the requirements to analyze by using a JQL filter.

The filter must grant viewing permission to the project.

Test Coverage Scope

Choose how to analyze the entities. The options are: Latest, Version, or Test Plan.

Latest

The report will consider the latest execution of the tests covering the requirements.

Version

You can choose a specific version to analyze.

Test Plan

If you choose to analyze by Test Plan, only Test Executions associated with the selected Test Plan are considered during the calculation of the requirement status.

Test Environment

The list of environments associated with the selected project. If you specify the Test Environment, only the executions executed in the specified environment are considered. E.g. you can choose to see the status of the release for the Android version of your product.

Final statuses have precedence over non-final

When this option is enabled, the latest Test Issue Status is calculated based on the latest Test Run with a final status. Otherwise, this calculation will always consider the latest Test Run that was created even if the status is non-final.

Columns

You can choose which fields make more sense to display.

  • No labels